| PT BADAK in
INDONESIA - BONTANG LNG : TRAINS A, B, C, D |
| Feasibility Study & FEED |
Assessment of existing 6000 instruments and control systems, technology selection, design and stepwise plan for
the refurbishment of the blast proof control room, system architecture DCS, ESD, ECS, MMS (17500 I/Os).
|
| NAFTEC in
ALGERIA - SKIKDA, ALGIER & HASSI MESSAOUD REFINERIES |
| Global Automation Modernization FEED |
Re-instrumentation analysers
systems, process control & safety, electrical power, telecommunications,
control
rooms consolidation, APC&MIS Systems , re-engineering workflow
- training - Laboratory.
|
| ZACDO MOSAICS
in ABU DHABI - UPPER ZAKUM & ZIRKU FACILITIES |
| Modernization
of Automation System FEED |
Modernization of the supervisory and control system at Zakum and Zirku facilities, supervisory System, SCADA,
telemetry system, DCS, ESD, F&G, Metering, SIL studies designed to satisfy the IEC 61508 standard.
|
| GASCO in ABU
DHABI - RUWAIS NGL GAS PLANT |
| Modernization of Automation System FEED |
Replacement of obsolescent instrument, implementation of a modern control system technology, hot transfer
strategy implementation, 2300 instruments, 5000 Hardwired I/Os, DCS, ESD, F&G systems, 520 km cabling system.
|
|